Sheridan Road Reconstruction

Project completed June, 2013

Location: Moultonborough, NH
Owner: Town of Moultonborough, NH
Engineer: KV Partners

Work on this Project consisted of reconstruction of deteriorating roadway through a narrow Right-of-Way within in a neighborhood that was sensitive to disruptions and construction nuisances. The work included installation of closed drainage systems to carry water existing surface drainage systems. Also included within the project the complete box reconstruction of the supporting gravel structures of the roadway to repair existing deficiencies. Work also narrowed the existing roadway […]

Route 4 and Morgan Way Intersection Improvements

Project completed April, 2012

Location: Durham, NH
Owner: Town of Durham and NH DOT
Engineer: CMA Engineers

The Project involved the addition of a turning lane on the East bound side of Route 4. In addition to the turning lane there was also work performed to improve drainage through the Project. The Project required the cutting of a very dense grove of trees that were intertwined with power lines running 19,900 Volts. In addition to the line clearing there was also a need to coordinate the […]

Maple Ridge Road Drainage & Reconsruction

Project Completed September, 2010

Location: Sandwich, NH
Owner: Town of Sandwich

This project was a road reconstruction project of a small rural road.  Reclaiming of the existing paved road helped to reduce costs over full reconstruction while still giving a good finished product better than just an overlay.  Additionally we removed the existing Reinforced Concrete cross culverts and replacement them with aluminized steel culverts.  State Spec. crushed gravel was installed over the reclaim prior to paving.  Ditching along the entire road was completed and installation of stone […]

Cedar Ridge Condos, Drainage and Parking Improvements

Project completed July, 2010

Location: Portsmouth, NH
Owner: Cedar Ridge Condominiums
Engineer: Ambit Engineering

With insufficient gravels under the existing pavement the parking lots and driveways had significant cracking and deformation. In addition to the pavement issues there was also a need to update the existing drainage system. With the update of the drainage system there was a need to rebuild some drainage structures and add poly inlet liners to extend the life of the structures. In addition to the repairs to the existing system, several […]

3/4 Mile Private Driveway, Silver Lake Home

Project completed March, 2010

Location: Madison, NH
Owner: Girouard Family
Construction Manager: Malcolm Thomas

This Project was a multi-phased project that centered around the construction of new private residence. All phases of the site work were awarded to G. W. Brooks and Son, Inc. The first phase involved the installation of an access road to the future home site. The existing woods road had trees grown very tight to it requiring clearing, in addition the existing road only went approximately halfway to the […]

Rice Hill Road Drainage and Road Reconstruction

Project completed September, 2009

Location: Freedom, NH
Owner: Town of Freedom, NH
Contracted By: Town of Freedom Highway Department

For this Project we were hired by the Town of Freedom to work alongside their crews in the reconstruction of Rice Hill Road. In the process of the reconstruction new under-drain was installed and new culvert crossings and head walls. The reconstruction required the removal of the poor performing existing gravels, installation of a woven roadway fabric, followed by the installation of new NH DOT spec. crushed […]

Harborview Drainage Installation

Project completed June, 2009

Location: Rye, NH
Owner: Cole and Holt Residences
Engineer: Ambit Engineering

The Project required the installation of 2 Catch Basins and drainage pipe. The objective of the project was to provide for a means to de-water the yards and basements of 2 homes on Harborview Drive. During the construction ledge was encountered and some alterations to the plans were made to reduce costs for the owners.

Due to the homes being built in an area with ledge near the ground surface there is […]

Country Woodland Estates

Location: Freedom, NH
Owner: Wendell and Pauline Brooks

The Project involved the clearing and grubbing of two subdivisions. The roads were installed with all utilities installed underground. The roadways were installed to the Town of Freedom specifications with asphalt pavement for the driving surface. Each road is approximately 850 feet long with a cul-de-sac at the end of each.

The Project was started upon realizing that portions of the land adjacent to the G. W. Brooks and Son, Inc. yard, shop, and office land […]

Burnham Road Bridge Replacement

Project completed October, 2007

Location: Freedom, NH
Owner: Town of Freedom, NH
Contracted By: Town of Freedom Highway Department

The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to The Project entailed the installation of a Rigid Frame Bridge to replace the previous twin 6 foot culverts. In addition to new bridge installation the bridge approaches were reconstructed. The Project required the […]