Monthly Archives: July 2016

Septic System Replacement – Bluffs Blvd

Project Completed: July 13, 2016

Location: Center Ossipee, NH

Replacement of a failed septic system.  The work included removal of the failed leach field and septic tank and replacing it with an Advanced Presby Enviro Pipe Septic System.  Special care was needed for scheduling because this was an occupied home.

The existing system had failed and was in need of replacement.  The original system was installed over 30 years ago, and the tank size was  under sized for the current regulations  for a 3 bedroom home.

Issue: The […]

The Estates at Sherwood Forest

Project Completed: July 6, 2016

Location: Freedom, NH
Owner: Camp Robin Hood
Engineer: White Mountain Survey Company, Inc.

This project involved construction of a Subdivision roadway for a new 55+ living community in Freedom, NH.   It was a total of approximately 1,600 Feet of Road to service 18 home sites.  Included with the project was underground utilities and some minor drainage work.

The project serves a growing need in the Town as a 55+ concierge community where all of your property needs are taken care of […]