Monthly Archives: May 2016

Jigger Johnson

Project Completed: October 27, 2015

Location: Jigger Johnson Campground: White Mountain Forest
Owner: United States Forest Service
Engineer: United States Forest Service
Manager: Pro Sport Inc.

Work involved replacement of an aging water system at a National Forest Campground.  The waterline stretched for nearly 6,000 feet in total and was replaced with HDPE Fusion Pipe.   The pipe run included a NHDOT road crossing of the Kangamangus Highway that required a directional drilling.  This work was the first major upgrade to the campground in many years […]

High Acres Road

Project Completed: October 22, 2015

Location: Randolph, NH
Owner: Town of Randolph

This Project involved Road Reconstruction to correct a deficient road bed.  Preexisting conditions had left the road barely passable and difficult to maintain.  Work included; replacing aging cross culverts, reshaping roadside swales, removing rocks and replacing unsuitable materials. The road surface was turned to a gravel surface in order to save costs.

This roadway had suffered from a poor subgrade with little in the way of gravel.  Rocks were protruding through the pavement […]

Econo Lodge

Project Completed: October 30, 2015

Location: West Ossipee, NH
Owner: Jamsan Hotel Management
Designer: Folsom Design Group

Installation of a replacement septic system for a failed system.  The work included removal of the failed system and replacement with a larger system for site and usage conditions.  Special care was needed for scheduling within a tight schedule based on the hotel’s needs.

The existing system had failed and was in need of replacement.  The facility has had many additions over the years which have resulted in […]

Waste Water Treatment Facility

Project Completed: September 25, 2015

Location: Sandwich, NH
Owner: Town of Sandwich
Engineer: Tighe & Bond Engineering

Replacement of settling tanks to increase volume and quality of the treatment.  The work included removal of the old tanks and replacing with two 25,000 gallon tanks to allow for more volume and settling capacity. Construction required phasing to maintain operation during construction.

The existing tanks were found to not be sufficiently settling out the solids and replacement of these tanks was needed. The existing systems and facilities were […]

Middleton Road

Project Completed: September 30 2015

Location: Wolfeboro, NH
Owner: Town of Wolfeboro
Engineer: Underwood Engineer, Inc.

This Project was a Road Reconstruction to correct drainage and a deficient road bed.  The existing roadway was a NHDOT unnumbered road which was to be turned over to the Town upon completion.  The work included enhancements and repairs to the existing drainage systems and removal of unsuitable materials.  Road work went from Route 28 (Weston’s Corner) to New Durham Town line; Approximately 1.75 miles.

As this roadway […]

Oak Ridge Road Reconstruction

Project Completed: May 30, 2016

Location: Madison, NH
Owner: Village District of Eidelweiss
Engineer: Fluet Engineers

This Project was a Road Reconstruction to correct drainage and a deficient road bed.  The work included enhancements and repairs to the existing drainage systems, removal of unsuitable materials and relocating a waterline.  Road work went from the bottom of Oak Ridge Road up approximately 1,300 feet.

As this roadway had become severely deteriorated over the years it had become a problem as it could no longer be patched or repaired and […]