Site Work

Baran Place Senior Housing Community

Project Completed: August 2018

Location: Eliot, ME
Owner: Baran Place Senior Housing Community
Engineer: Ambit Engineering

This Project was developed to correct drainage and subsurface conditions in a retirement community.  The work involved reclaiming the asphalt parking lot and driveways and amendment of the reclaim to provide a proper base.  Additionally, due to low permeable soils, underdrains were installed to facilitate draining the water away from the base of the parking and driveway areas.

The existing driveway and parking areas were in varying states of […]

  • Permalink Gallery

    Statewide Site Improvements Littleton & Strafford National Guard Armories

Statewide Site Improvements Littleton & Strafford National Guard Armories

Projects completed 2017

Location: Littleton, NH
Owner: NH National Guard
Engineer: Tighe & Bond

This Project involved construction at two NH National Guard Bases Littleton and Strafford, NH.  The smaller site was in Littleton, NH.  This site required improvements to drainage and the parking lot.  Additionally, the base was better secured with fencing and security gates as part of the project.

This site handles many of the NH National Guards vehicle’s maintenance needs.  As such is a highly active site with significant parking needs.  With […]

Farmington Safe Routes to School Infrastructure Project

Project Completed 2017

Location: Farmington, NH
Owner: Town of Farmington
Engineer: CMA Engineering

Safe Routes to Schools Projects are projects predominantly funded by NHDOT.  These funds assist communities to increase pedestrian and bicycle safety to promote these modes of travel to school.  This project involved tip downs and other accessibility and safety issues in the area of the Farmington Middle School and High School.

The project involved significant engineering by CMA Engineers prior to construction to meet all of the needs of the community.  As work […]

The Estates at Sherwood Forest

Project Completed: July 6, 2016

Location: Freedom, NH
Owner: Camp Robin Hood
Engineer: White Mountain Survey Company, Inc.

This project involved construction of a Subdivision roadway for a new 55+ living community in Freedom, NH.   It was a total of approximately 1,600 Feet of Road to service 18 home sites.  Included with the project was underground utilities and some minor drainage work.

The project serves a growing need in the Town as a 55+ concierge community where all of your property needs are taken care of […]

Jigger Johnson

Project Completed: October 27, 2015

Location: Jigger Johnson Campground: White Mountain Forest
Owner: United States Forest Service
Engineer: United States Forest Service
Manager: Pro Sport Inc.

Work involved replacement of an aging water system at a National Forest Campground.  The waterline stretched for nearly 6,000 feet in total and was replaced with HDPE Fusion Pipe.   The pipe run included a NHDOT road crossing of the Kangamangus Highway that required a directional drilling.  This work was the first major upgrade to the campground in many years […]

Private Residential Pond Construction

Project Completed: November 18, 2015

Location: Chocorua, NH
General Contractor: John E Roberts

The construction of the pond was to add to the homeowners landscape.  The pond has the perfect backdrop of Mount Chocorua, adding to the scenic atmosphere. The pond will be a great place to sit and relax next to on a warm summer night, and a fun place for the family to ice skate in the winter months.  The pond was excavated down 15 feet to allow for the […]

Pease Golf Course Parking Lot

Project completed 2014

Location: Portsmouth, NH
Owner: Carroll County, NH
Engineer: Tighe & Bond

The Project required the reconstruction and expansion of the existing parking lot which was part gravel and part asphalt.  Work included the installation of drainage systems (including porous pavement), new lot lighting, landscaping, and complete reconstruction of the parking lot.

The existing parking lot was a mixture of gravel and paved portions.  With the ongoing improvements to the course the parking lot was a logical improvement.  The project required the course to […]

Ossipee Lake Camping Area Phases 1 – 3

Project completed May, 2014

Location: Effingham, NH
Owner: Ossipee Lake Camping Area
Engineer: SFC Engineering Partnership

This project has been an ongoing project for three years where winter phasing was required to maintain access to the campground during busier months. During the course of construction the existing campground’s effluent disposal systems have been removed and replaced with DES compliant systems. The project required multiple tanks per campground area with multiple leach fields throughout the campground to handle the loading campsites can place on septic systems.

The project facility […]

Camp Calumet Duplex Site Work and Septic

Project completed July, 2012

Location: Freedom, NH
Owner: Calumet Lutheran Ministries

The Project called for 2 foundations be dug and associated site work for 2 new camp buildings. The Project required clearing and grubbing, site grading, and other associated work to prepare the site for the new buildings which would be built separate from our contract. In addition to the buildings there was a need for a combined septic system be installed for them. While constructing the septic leach field for the 2 current […]

Freedom Public Safety Complex

Project completed May, 2012

Location: Freedom, NH
Owner: Town of Freedom, NH
Engineer: White Mountain Survey Company, Inc.
General Contractor: Desmarais & Associates, LLC.

The Project was focused on an addition to the existing Freedom Fire Station to provide new space for the Police Department and some additional space for the Fire Department. Work on this project required clearing of the wooded portions of the site, excavation for the addition, and associated site work for the drainage and other site needs. The Project required a fast time […]