Private Residential Pond Construction

Project Completed: November 18, 2015

Location: Chocorua, NH
General Contractor: John E Roberts

The construction of the pond was to add to the homeowners landscape.  The pond has the perfect backdrop of Mount Chocorua, adding to the scenic atmosphere. The pond will be a great place to sit and relax next to on a warm summer night, and a fun place for the family to ice skate in the winter months.  The pond was excavated down 15 feet to allow for the […]

Pease Golf Course Parking Lot

Project completed 2014

Location: Portsmouth, NH
Owner: Carroll County, NH
Engineer: Tighe & Bond

The Project required the reconstruction and expansion of the existing parking lot which was part gravel and part asphalt.  Work included the installation of drainage systems (including porous pavement), new lot lighting, landscaping, and complete reconstruction of the parking lot.

The existing parking lot was a mixture of gravel and paved portions.  With the ongoing improvements to the course the parking lot was a logical improvement.  The project required the course to […]

Ossipee Lake Camping Area Phases 1 – 3

Project completed May, 2014

Location: Effingham, NH
Owner: Ossipee Lake Camping Area
Engineer: SFC Engineering Partnership

This project has been an ongoing project for three years where winter phasing was required to maintain access to the campground during busier months. During the course of construction the existing campground’s effluent disposal systems have been removed and replaced with DES compliant systems. The project required multiple tanks per campground area with multiple leach fields throughout the campground to handle the loading campsites can place on septic systems.

The project facility […]

Camp Calumet Duplex Site Work and Septic

Project completed July, 2012

Location: Freedom, NH
Owner: Calumet Lutheran Ministries

The Project called for 2 foundations be dug and associated site work for 2 new camp buildings. The Project required clearing and grubbing, site grading, and other associated work to prepare the site for the new buildings which would be built separate from our contract. In addition to the buildings there was a need for a combined septic system be installed for them. While constructing the septic leach field for the 2 current […]

Freedom Public Safety Complex

Project completed May, 2012

Location: Freedom, NH
Owner: Town of Freedom, NH
Engineer: White Mountain Survey Company, Inc.
General Contractor: Desmarais & Associates, LLC.

The Project was focused on an addition to the existing Freedom Fire Station to provide new space for the Police Department and some additional space for the Fire Department. Work on this project required clearing of the wooded portions of the site, excavation for the addition, and associated site work for the drainage and other site needs. The Project required a fast time […]

Littleton Riverwalk Phase II

Project completed June,  2011

Location: Littleton, NH
Owner: Town of Littleton, NH
Engineer: HE Bergeron Engineers

This Project is envisioned to be a pedestrian link for all of the portions of downtown Littleton and the Ammonoosuc River Recreation area. As the second phase of the project, Phase 2 connected to where Phase 1 left off with a covered bridge. The Project was partially funded through the American Recovery and Reinvestment Act (ARRA). Being part of the ARRA this project required additional paperwork and record keeping beyond […]

Cedar Ridge Condos, Drainage and Parking Improvements

Project completed July, 2010

Location: Portsmouth, NH
Owner: Cedar Ridge Condominiums
Engineer: Ambit Engineering

With insufficient gravels under the existing pavement the parking lots and driveways had significant cracking and deformation. In addition to the pavement issues there was also a need to update the existing drainage system. With the update of the drainage system there was a need to rebuild some drainage structures and add poly inlet liners to extend the life of the structures. In addition to the repairs to the existing system, several […]

3/4 Mile Private Driveway, Silver Lake Home

Project completed March, 2010

Location: Madison, NH
Owner: Girouard Family
Construction Manager: Malcolm Thomas

This Project was a multi-phased project that centered around the construction of new private residence. All phases of the site work were awarded to G. W. Brooks and Son, Inc. The first phase involved the installation of an access road to the future home site. The existing woods road had trees grown very tight to it requiring clearing, in addition the existing road only went approximately halfway to the […]

Harborview Drainage Installation

Project completed June, 2009

Location: Rye, NH
Owner: Cole and Holt Residences
Engineer: Ambit Engineering

The Project required the installation of 2 Catch Basins and drainage pipe. The objective of the project was to provide for a means to de-water the yards and basements of 2 homes on Harborview Drive. During the construction ledge was encountered and some alterations to the plans were made to reduce costs for the owners.

Due to the homes being built in an area with ledge near the ground surface there is […]

White Mountain Administration Complex

Project completed October, 2008

Location: Campton, NH
Owner: White Mountain National Forest
Engineer: USDA Forest Service
General Contractor: P & S Construction

The Project involved the site work for a new 25,000 Square Foot Office building to house the White Mountain National Forest Administrative Services. Throughout the project emphasis was placed on recycling any materials that possibly could be recycled. In addition to the building excavation the project involved installing perimeter drains, installing stone drip edges, installing base materials for walkways surrounding the main building, and general […]