Project Completed: Phase I: August 29, 2014    Phase II: November 1, 2016

Location: Belmont, NH
Owner: Town of Belmont
Engineer: Underwood Engineers

Reconstruction and Drainage Improvements to a main town roadway with a very steep grade (over 12%) and feeder streets.  Work included construction of new closed drainage systems along with grass, stone, and paved ditches.

The existing roadway on Ladd Hill was deteriorating and there was limited existing drainage.  The smaller side streets were in worse condition in terms of their asphalt surface.  The project […]