Pease Golf Course Parking Lot

Project completed 2013

Location: Portsmouth, NH
Owner: Carroll County, NH
Engineer: Tighe & Bond

The Project required the reconstruction and expansion of the existing parking lot which was part gravel and part asphalt.  Work included the installation of drainage systems (including porous pavement), new lot lighting, landscaping, and complete reconstruction of the parking lot.

The existing parking lot was a mixture of gravel and paved portions.  With the ongoing improvements to the course the parking lot was a logical improvement.  The project required the course to […]

The Estates at Sherwood Forest

Project Completed: July 6, 2016

Location: Freedom, NH
Owner: Camp Robin Hood
Engineer: White Mountain Survey Company, Inc.

This project involved construction of a Subdivision roadway for a new 55+ living community in Freedom, NH.   It was a total of approximately 1,600 Feet of Road to service 18 home sites.  Included with the project was underground utilities and some minor drainage work.

The project serves a growing need in the Town as a 55+ concierge community where all of your property needs are taken care of […]

Oak Ridge Road Reconstruction

Project Completed: May 30, 2016

Location: Madison, NH
Owner: Village District of Eidelweiss
Engineer: Fluet Engineers

This Project was a Road Reconstruction to correct drainage and a deficient road bed.  The work included enhancements and repairs to the existing drainage systems, removal of unsuitable materials and relocating a waterline.  Road work went from the bottom of Oak Ridge Road up approximately 1,300 feet.

As this roadway had become severely deteriorated over the years it had become a problem as it could no longer be patched or repaired and […]

Frost Brook Bridge

Project completed May, 2012

Location: Madison, NH
Owner: Town of Madison, NH
Design Build Team: G. W. Brooks and French Engineering

The Project involved the removal of a failing Red Listed bridge (in this case twin 48″ Culverts) and installation of a new precast rigid frame bridge.  As a cost savings method and in order to expedite the project it was a put out to bid as a Design-Build bridge.  This project was funded through a capital reserve plan which removed a great deal of the […]

Septic System Replacement – Scarboro Road

Project Completed: December 23, 2016

Location: Freedom, NH

Installation of a Replacement Septic System for a failed system.  The work included pumping and filling the old steel tank and installing an Presby EnviroFin Septic System.

The existing system was declared failed during a home inspection and in need of fixing in order to sell the home.  The original system was installed over 30 years ago, the tank was made of steel and was under sized for the current regulations  for a 3 bedroom […]

Septic System Replacement – Bluffs Blvd

Project Completed: July 13, 2016

Location: Center Ossipee, NH

Replacement of a failed septic system.  The work included removal of the failed leach field and septic tank and replacing it with an Advanced Presby Enviro Pipe Septic System.  Special care was needed for scheduling because this was an occupied home.

The existing system had failed and was in need of replacement.  The original system was installed over 30 years ago, and the tank size was  under sized for the current regulations  for a 3 bedroom home.

Issue: The […]

Private Residential Pond Construction

Project Completed: November 18, 2015

Location: Chocorua, NH
General Contractor: John E Roberts

The construction of the pond was to add to the homeowners landscape.  The pond has the perfect backdrop of Mount Chocorua, adding to the scenic atmosphere. The pond will be a great place to sit and relax next to on a warm summer night, and a fun place for the family to ice skate in the winter months.  The pond was excavated down 15 feet to allow for the […]

Bridge Over Stony Brook Replacement

Project Completed: September 1, 2016

Location: Tamworth, NH
Owner: Town of Tamworth
Engineer: Northpoint Engineering

This Project was to replace a NHDOT Red-listed Bridge for the Town of Tamworth.  This bridge had significant scour issues under the abutments due to many factors.  To mitigate these issues a larger and better aligned with the brook channel bridge was installed.

The bridge is located on Whittier Road in Tamworth, a former NHDOT roadway.  The original bridge was installed in 1927 and was sized much smaller than current […]

Maple Ridge Road Drainage & Reconsruction

Project Completed September, 2010

Location: Sandwich, NH
Owner: Town of Sandwich

This project was a road reconstruction project of a small rural road.  Reclaiming of the existing paved road helped to reduce costs over full reconstruction while still giving a good finished product better than just an overlay.  Additionally we removed the existing Reinforced Concrete cross culverts and replacement them with aluminized steel culverts.  State Spec. crushed gravel was installed over the reclaim prior to paving.  Ditching along the entire road was completed and installation of stone […]

Ladd Hill Road Reconstruction Phases 1-2

Project Completed: Phase I: August 29, 2014    Phase II: November 1, 2016

Location: Belmont, NH
Owner: Town of Belmont
Engineer: Underwood Engineers

Reconstruction and Drainage Improvements to a main town roadway with a very steep grade (over 12%) and feeder streets.  Work included construction of new closed drainage systems along with grass, stone, and paved ditches.

The existing roadway on Ladd Hill was deteriorating and there was limited existing drainage.  The smaller side streets were in worse condition in terms of their asphalt surface.  The project […]