Jigger Johnson

Project Completed: October 27, 2015

Location: Jigger Johnson Campground: White Mountain Forest
Owner: United States Forest Service
Engineer: United States Forest Service
Manager: Pro Sport Inc.

Work involved replacement of an aging water system at a National Forest Campground.  The waterline stretched for nearly 6,000 feet in total and was replaced with HDPE Fusion Pipe.   The pipe run included a NHDOT road crossing of the Kangamangus Highway that required a directional drilling.  This work was the first major upgrade to the campground in many years […]

High Acres Road

Project Completed: October 22, 2015

Location: Randolph, NH
Owner: Town of Randolph

This Project involved Road Reconstruction to correct a deficient road bed.  Preexisting conditions had left the road barely passable and difficult to maintain.  Work included; replacing aging cross culverts, reshaping roadside swales, removing rocks and replacing unsuitable materials. The road surface was turned to a gravel surface in order to save costs.

This roadway had suffered from a poor subgrade with little in the way of gravel.  Rocks were protruding through the pavement […]

Econo Lodge

Project Completed: October 30, 2015

Location: West Ossipee, NH
Owner: Jamsan Hotel Management
Designer: Folsom Design Group

Installation of a replacement septic system for a failed system.  The work included removal of the failed system and replacement with a larger system for site and usage conditions.  Special care was needed for scheduling within a tight schedule based on the hotel’s needs.

The existing system had failed and was in need of replacement.  The facility has had many additions over the years which have resulted in […]

Waste Water Treatment Facility

Project Completed: September 25, 2015

Location: Sandwich, NH
Owner: Town of Sandwich
Engineer: Tighe & Bond Engineering

Replacement of settling tanks to increase volume and quality of the treatment.  The work included removal of the old tanks and replacing with two 25,000 gallon tanks to allow for more volume and settling capacity. Construction required phasing to maintain operation during construction.

The existing tanks were found to not be sufficiently settling out the solids and replacement of these tanks was needed. The existing systems and facilities were […]

Middleton Road

Project Completed: September 30 2015

Location: Wolfeboro, NH
Owner: Town of Wolfeboro
Engineer: Underwood Engineer, Inc.

This Project was a Road Reconstruction to correct drainage and a deficient road bed.  The existing roadway was a NHDOT unnumbered road which was to be turned over to the Town upon completion.  The work included enhancements and repairs to the existing drainage systems and removal of unsuitable materials.  Road work went from Route 28 (Weston’s Corner) to New Durham Town line; Approximately 1.75 miles.

As this roadway […]

Private Residential Pond Construction

Project Completed: November 18, 2015

Location: Chocorua, NH
General Contractor: John E Roberts

The construction of the pond was to add to the homeowners landscape.  The pond has the perfect backdrop of Mount Chocorua, adding to the scenic atmosphere. The pond will be a great place to sit and relax next to on a warm summer night, and a fun place for the family to ice skate in the winter months.  The pond was excavated down 15 feet to allow for the […]

Frost Brook Bridge

Project completed May, 2014

Location: Madison, NH
Owner: Town of Madison, NH
Design Build Team: G. W. Brooks and French Engineering

The Project involved the removal of a failing Red Listed bridge (in this case twin 48″ Culverts) and installation of a new precast rigid frame bridge.  As a cost savings method and in order to expedite the project it was a put out to bid as a Design-Build bridge.  This project was funded through a capital reserve plan which removed a great deal of the […]

Pease Golf Course Parking Lot

Project completed 2014

Location: Portsmouth, NH
Owner: Carroll County, NH
Engineer: Tighe & Bond

The Project required the reconstruction and expansion of the existing parking lot which was part gravel and part asphalt.  Work included the installation of drainage systems (including porous pavement), new lot lighting, landscaping, and complete reconstruction of the parking lot.

The existing parking lot was a mixture of gravel and paved portions.  With the ongoing improvements to the course the parking lot was a logical improvement.  The project required the course to […]

Maple Ridge Road Drainage & Reconsruction

Project Completed September, 2010

Location: Sandwich, NH
Owner: Town of Sandwich

This project was a road reconstruction project of a small rural road.  Reclaiming of the existing paved road helped to reduce costs over full reconstruction while still giving a good finished product better than just an overlay.  Additionally we removed the existing Reinforced Concrete cross culverts and replacement them with aluminized steel culverts.  State Spec. crushed gravel was installed over the reclaim prior to paving.  Ditching along the entire road was completed and installation of stone […]