Site Work

Watson Hill Fire Pond Dredging & Hydrant Installation

Project Completed: August 2024

Location: Freedom, NH
Owner: Town of Freedom

This project consisted of dredging the fire pond on Watson Hill Rd and the installation of a new HDPE Dry Hydrant with a Fused HDPE Strainer. We also installed a HDPE recirculation pipe to allow for recirculation of the pond water during drafting operations.

Fire ponds are vital in rural areas so that fire fighters can have access to water when needed.  Fire ponds need to be dredged over time and remove […]

Lees Mill Landing Retaining Wall

Project Completed: 2024

Location: Moultonborough, NH
Owner: Town of Moultonborough
Engineer: Design Build

This project was a design-build project, the scope of the work was construction for the replacement of the deteriorating timber retaining wall, along the island docks portion of Lees Mill Landing, with a new redi-rock wall retaining wall. Also the replacement of dock structures.

The existing timber retaining wall (310 LF +/-) was deteriorating and creating sink holes behind the wall that were becoming a hazard. It was deteriorating to the […]

Landside Improvements Project at the States Landing Beach

Project Completed: May 2022

Location: Moultonborough, NH
Owner: Town of Moultonborough
Engineer: KV Partners Consulting Engineers

The work consisted of constructing a parking lot, rain gardens, and recreation trails for a boat launch facility. The project utilized detention ponds and rain gardens to manage rain water run off entering the lake. Walking pathways were constructed for future expansions.

 

Main Street South Sidewalk Project

Project Completed: April 2021

Location: Durham, NH
Owner: University of New Hampshire
Engineer: CMA Engineers, Inc.

This project consisted of installing a new sidewalk on the University of New Hampshire campus in Durham, NH along the south side of Main Street. Sidewalk installation included minor shoulder rehabilitation, drainage modification, landscaping, pedestrian lighting, retaining walls, and ADA compliant ramps, sidewalks, and bus shelter.

 

Beach Retaining Wall

Project Completed: June 2021

Location: Freedom, NH
Owner: Calumet Lutheran Ministries

The project consisted of constructing a redi-rock retaining wall along the beach front of Camp Calumet with granite steps to allow for safe access to the water for the campers.

The Camp wanted to make their waterfront area safer for campers, and to prevent any erosion issues that could come up with waterfront property.

 

Baran Place Senior Housing Community

Project Completed: August 2018

Location: Eliot, ME
Owner: Baran Place Senior Housing Community
Engineer: Ambit Engineering

This Project was developed to correct drainage and subsurface conditions in a retirement community.  The work involved reclaiming the asphalt parking lot and driveways and amendment of the reclaim to provide a proper base.  Additionally, due to low permeable soils, underdrains were installed to facilitate draining the water away from the base of the parking and driveway areas.

The existing driveway and parking areas were in varying states of […]

  • Permalink Gallery

    Statewide Site Improvements Littleton & Strafford National Guard Armories

Statewide Site Improvements Littleton & Strafford National Guard Armories

Projects completed 2017

Location: Littleton, NH
Owner: NH National Guard
Engineer: Tighe & Bond

This Project involved construction at two NH National Guard Bases Littleton and Strafford, NH.  The smaller site was in Littleton, NH.  This site required improvements to drainage and the parking lot.  Additionally, the base was better secured with fencing and security gates as part of the project.

This site handles many of the NH National Guards vehicle’s maintenance needs.  As such is a highly active site with significant parking needs.  With […]

Farmington Safe Routes to School Infrastructure Project

Project Completed 2017

Location: Farmington, NH
Owner: Town of Farmington
Engineer: CMA Engineering

Safe Routes to Schools Projects are projects predominantly funded by NHDOT.  These funds assist communities to increase pedestrian and bicycle safety to promote these modes of travel to school.  This project involved tip downs and other accessibility and safety issues in the area of the Farmington Middle School and High School.

The project involved significant engineering by CMA Engineers prior to construction to meet all of the needs of the community.  As work […]

The Estates at Sherwood Forest

Project Completed: July 6, 2016

Location: Freedom, NH
Owner: Camp Robin Hood
Engineer: White Mountain Survey Company, Inc.

This project involved construction of a Subdivision roadway for a new 55+ living community in Freedom, NH.   It was a total of approximately 1,600 Feet of Road to service 18 home sites.  Included with the project was underground utilities and some minor drainage work.

The project serves a growing need in the Town as a 55+ concierge community where all of your property needs are taken care of […]

Jigger Johnson

Project Completed: October 27, 2015

Location: Jigger Johnson Campground: White Mountain Forest
Owner: United States Forest Service
Engineer: United States Forest Service
Manager: Pro Sport Inc.

Work involved replacement of an aging water system at a National Forest Campground.  The waterline stretched for nearly 6,000 feet in total and was replaced with HDPE Fusion Pipe.   The pipe run included a NHDOT road crossing of the Kangamangus Highway that required a directional drilling.  This work was the first major upgrade to the campground in many years […]