Ossipee Lake Camping Area Phases 1 – 3
Project completed May, 2014
Location: Effingham, NH
Owner: Ossipee Lake Camping Area
Engineer: SFC Engineering Partnership
This project has been an ongoing project for three years where winter phasing was required to maintain access to the campground during busier months. During the course of construction the existing campground’s effluent disposal systems have been removed and replaced with DES compliant systems. The project required multiple tanks per campground area with multiple leach fields throughout the campground to handle the loading campsites can place on septic systems.
The project facility […]