Ossipee Lake Camping Area Phases 1 – 3

Project completed May, 2014

Location: Effingham, NH
Owner: Ossipee Lake Camping Area
Engineer: SFC Engineering Partnership

This project has been an ongoing project for three years where winter phasing was required to maintain access to the campground during busier months. During the course of construction the existing campground’s effluent disposal systems have been removed and replaced with DES compliant systems. The project required multiple tanks per campground area with multiple leach fields throughout the campground to handle the loading campsites can place on septic systems.

The project facility […]

Winter is here, and that means snow removal.

It has been one Fine New England Winter, and that means our fleet of plow trucks, sanders, loaders, and dump trucks are very busy removing tons of snow from driveways to parking-lots.

 

 

Sheridan Road Reconstruction

Project completed June, 2013

Location: Moultonborough, NH
Owner: Town of Moultonborough, NH
Engineer: KV Partners

Work on this Project consisted of reconstruction of deteriorating roadway through a narrow Right-of-Way within in a neighborhood that was sensitive to disruptions and construction nuisances. The work included installation of closed drainage systems to carry water existing surface drainage systems. Also included within the project the complete box reconstruction of the supporting gravel structures of the roadway to repair existing deficiencies. Work also narrowed the existing roadway […]

Lamprey River Coop Community Septic

Project completed May, 2013

Location: Raymond, NH
Owner: Lamprey River Cooperative
Engineer: Provan & Lorber

This project required the discontinuation of 21 individual existing septic systems with individual septic tanks and a common pump station and leach field. The system utilized multiple septic tanks (some single units some double units). These tanks lead to a gravity collection line which feeds to a pump station for final treatment within a raised leaching field. The project was funded with funds from the Rural Development Loan Fund, Community Block […]

Camp Calumet Duplex Site Work and Septic

Project completed July, 2012

Location: Freedom, NH
Owner: Calumet Lutheran Ministries

The Project called for 2 foundations be dug and associated site work for 2 new camp buildings. The Project required clearing and grubbing, site grading, and other associated work to prepare the site for the new buildings which would be built separate from our contract. In addition to the buildings there was a need for a combined septic system be installed for them. While constructing the septic leach field for the 2 current […]

Freedom Public Safety Complex

Project completed May, 2012

Location: Freedom, NH
Owner: Town of Freedom, NH
Engineer: White Mountain Survey Company, Inc.
General Contractor: Desmarais & Associates, LLC.

The Project was focused on an addition to the existing Freedom Fire Station to provide new space for the Police Department and some additional space for the Fire Department. Work on this project required clearing of the wooded portions of the site, excavation for the addition, and associated site work for the drainage and other site needs. The Project required a fast time […]

Places Mill Road Bridge

Project completed May, 2012

Location: Alton, NH
Owner: Town of Alton, NH
Engineer: Dubois and King

The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to handle potential heavy water flows. The new bridge was designed to be capable of handling 72 ton loads and ample space for handling heavy flood flows. Throughout the project care was necessary while working next to […]

Route 4 and Morgan Way Intersection Improvements

Project completed April, 2012

Location: Durham, NH
Owner: Town of Durham and NH DOT
Engineer: CMA Engineers

The Project involved the addition of a turning lane on the East bound side of Route 4. In addition to the turning lane there was also work performed to improve drainage through the Project. The Project required the cutting of a very dense grove of trees that were intertwined with power lines running 19,900 Volts. In addition to the line clearing there was also a need to coordinate the […]

Sugar Hill Retirement Community Leach Field Replacement

Project completed June 2011

Location: Wolfeboro, NH
Owner: Sugar Hill Retirement Community
Engineer: White Mountain Survey Company, Inc.

The Project called for the replacement of 4 Effluent Disposal Areas (EDAs; leaching fields). The EDAs are designed to handle 4,975 gallons per day. The reconstruction required phasing so that only 2 fields would be offline at any one time. The project was on a fast track and because of this required construction during winter conditions which required the use of frost blankets and other unique techniques. The […]

Littleton Riverwalk Phase II

Project completed June,  2011

Location: Littleton, NH
Owner: Town of Littleton, NH
Engineer: HE Bergeron Engineers

This Project is envisioned to be a pedestrian link for all of the portions of downtown Littleton and the Ammonoosuc River Recreation area. As the second phase of the project, Phase 2 connected to where Phase 1 left off with a covered bridge. The Project was partially funded through the American Recovery and Reinvestment Act (ARRA). Being part of the ARRA this project required additional paperwork and record keeping beyond […]