Private Residence Patio

Project completed 2017

Location: Alton, NH

Installed granite cobble stones to make a patio area.

This property has a very small yard, with one area that is shaded and grass never grew.  After a summer rain shower this area would be muddy and just a mess.  The homeowner wanted to create a patio area where they could keep the table, so even after a rain shower the family could enjoy the outdoors. The area selected for this patio was excavated of all […]

The Estates at Sherwood Forest

Project Completed: July 6, 2016

Location: Freedom, NH
Owner: Camp Robin Hood
Engineer: White Mountain Survey Company, Inc.

This project involved construction of a Subdivision roadway for a new 55+ living community in Freedom, NH.   It was a total of approximately 1,600 Feet of Road to service 18 home sites.  Included with the project was underground utilities and some minor drainage work.

The project serves a growing need in the Town as a 55+ concierge community where all of your property needs are taken care of […]

Private Residential Pond Construction

Project Completed: November 18, 2015

Location: Chocorua, NH
General Contractor: John E Roberts

The construction of the pond was to add to the homeowners landscape.  The pond has the perfect backdrop of Mount Chocorua, adding to the scenic atmosphere. The pond will be a great place to sit and relax next to on a warm summer night, and a fun place for the family to ice skate in the winter months.  The pond was excavated down 15 feet to allow for the […]

Eaton Home Jacking and Excavation

Project completed Fall, 2010

Location: Eaton, NH
Owner: Private Residence
General Contractor: Frog Rock Woodworks

The Project began as an addition to the existing home. Once excavation began the project was expanded to excavation of the existing stone foundation and creating space for a full crawl space under the home. The Project required careful excavation due to tight spaces between a second home behind the home being renovated and nearby barn.

The Project was on a home that had some historic significance to the area which was […]

3/4 Mile Private Driveway, Silver Lake Home

Project completed March, 2010

Location: Madison, NH
Owner: Girouard Family
Construction Manager: Malcolm Thomas

This Project was a multi-phased project that centered around the construction of new private residence. All phases of the site work were awarded to G. W. Brooks and Son, Inc. The first phase involved the installation of an access road to the future home site. The existing woods road had trees grown very tight to it requiring clearing, in addition the existing road only went approximately halfway to the […]

Harborview Drainage Installation

Project completed June, 2009

Location: Rye, NH
Owner: Cole and Holt Residences
Engineer: Ambit Engineering

The Project required the installation of 2 Catch Basins and drainage pipe. The objective of the project was to provide for a means to de-water the yards and basements of 2 homes on Harborview Drive. During the construction ledge was encountered and some alterations to the plans were made to reduce costs for the owners.

Due to the homes being built in an area with ledge near the ground surface there is […]