Road Work

Harborview Drainage Installation

Project completed June, 2009

Location: Rye, NH
Owner: Cole and Holt Residences
Engineer: Ambit Engineering

The Project required the installation of 2 Catch Basins and drainage pipe. The objective of the project was to provide for a means to de-water the yards and basements of 2 homes on Harborview Drive. During the construction ledge was encountered and some alterations to the plans were made to reduce costs for the owners.

Due to the homes being built in an area with ledge near the ground surface there is […]

Country Woodland Estates

Location: Freedom, NH
Owner: Wendell and Pauline Brooks

The Project involved the clearing and grubbing of two subdivisions. The roads were installed with all utilities installed underground. The roadways were installed to the Town of Freedom specifications with asphalt pavement for the driving surface. Each road is approximately 850 feet long with a cul-de-sac at the end of each.

The Project was started upon realizing that portions of the land adjacent to the G. W. Brooks and Son, Inc. yard, shop, and office land […]

Burnham Road Bridge Replacement

Project completed October, 2007

Location: Freedom, NH
Owner: Town of Freedom, NH
Contracted By: Town of Freedom Highway Department

The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to The Project entailed the installation of a Rigid Frame Bridge to replace the previous twin 6 foot culverts. In addition to new bridge installation the bridge approaches were reconstructed. The Project required the […]