Burnham Road Bridge Replacement
Project completed October, 2007
Location: Freedom, NH
Owner: Town of Freedom, NH
Contracted By: Town of Freedom Highway Department
The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to The Project entailed the installation of a Rigid Frame Bridge to replace the previous twin 6 foot culverts. In addition to new bridge installation the bridge approaches were reconstructed. The Project required the […]