All Projects

Center Street Road Reconstruction

Project Completed: July 2019

Location: Wolfeboro, NH
Owner: Town of Wolfeboro
Engineer: Stantec

This project is to improve Center Street (Route 28) in front of the Wolfeboro Shopping Center and up to the top of the hill at the South Main Street (Route 109) Intersection.  This is a stretch of road which has become very rough over the years and needed significant attention. The work involves reconstruction of the drainage, utilities, and road.  Additionally, there are safety improvements planned which will improve motorist and pedestrian safety.

This project […]

Pine and Lehner Street Water Improvements

Completed: September 2018

Location: Wolfeboro, NH
Owner: Town of Wolfeboro
Engineer: Stantec

Installed Approximately 1000 feet of 8″ Ductile Iron Pipe and Associated Services to bring Pine and Lehner Street’s remaining water system up to current standards.

Three previous projects had brought most of the area up to current AWWA standards.  The remaining sections of Pine and Lehner Streets were upgraded under this contract.

 

Septic System Replacement, System C – Totem Pole Park

Project Completed: May 2018

Location: Freedom, NH
Owner: Totem Pole Park
Engineer: SFC Engineering Partnership, Inc.

A large septic system replacement for a lakefront community.  Work included a new leach field, replacement of some of the existing tanks, and associated site work and landscaping.

This project involved the replacement of a Leach field and addition of septic tanks for a large seasonal lakefront community.  The community has a total of five systems which service over 400 Sites.  This system happens to be the largest and […]

Baran Place Senior Housing Community

Project Completed: August 2018

Location: Eliot, ME
Owner: Baran Place Senior Housing Community
Engineer: Ambit Engineering

This Project was developed to correct drainage and subsurface conditions in a retirement community.  The work involved reclaiming the asphalt parking lot and driveways and amendment of the reclaim to provide a proper base.  Additionally, due to low permeable soils, underdrains were installed to facilitate draining the water away from the base of the parking and driveway areas.

The existing driveway and parking areas were in varying states of […]

  • Permalink Gallery

    Statewide Site Improvements Littleton & Strafford National Guard Armories

Statewide Site Improvements Littleton & Strafford National Guard Armories

Projects completed 2017

Location: Littleton, NH
Owner: NH National Guard
Engineer: Tighe & Bond

This Project involved construction at two NH National Guard Bases Littleton and Strafford, NH.  The smaller site was in Littleton, NH.  This site required improvements to drainage and the parking lot.  Additionally, the base was better secured with fencing and security gates as part of the project.

This site handles many of the NH National Guards vehicle’s maintenance needs.  As such is a highly active site with significant parking needs.  With […]

Lower Bay Road Reconstruction Phase 1

Project Completed 2017

Location: Sanbornton, NH
Owner: Town of Sanbornton

Lower Bay Road is a main feeder road for the Town of Sanbornton.  This road needed to have significant work performed to repair a very rough surface.

The project involved the northern section of Lower Bay Road and is the first of several phases to be completed on the road.  The work involved controlling the groundwater which was causing premature deterioration of the road surface.  The project called for installation of underdrain, reclaiming of […]

Farmington Safe Routes to School Infrastructure Project

Project Completed 2017

Location: Farmington, NH
Owner: Town of Farmington
Engineer: CMA Engineering

Safe Routes to Schools Projects are projects predominantly funded by NHDOT.  These funds assist communities to increase pedestrian and bicycle safety to promote these modes of travel to school.  This project involved tip downs and other accessibility and safety issues in the area of the Farmington Middle School and High School.

The project involved significant engineering by CMA Engineers prior to construction to meet all of the needs of the community.  As work […]

Private Residence Patio

Project completed 2017

Location: Alton, NH

Installed granite cobble stones to make a patio area.

This property has a very small yard, with one area that is shaded and grass never grew.  After a summer rain shower this area would be muddy and just a mess.  The homeowner wanted to create a patio area where they could keep the table, so even after a rain shower the family could enjoy the outdoors. The area selected for this patio was excavated of all […]

Septic System Replacement – Scarboro Road

Project Completed: December 23, 2016

Location: Freedom, NH

Installation of a Replacement Septic System for a failed system.  The work included pumping and filling the old steel tank and installing an Presby EnviroFin Septic System.

The existing system was declared failed during a home inspection and in need of fixing in order to sell the home.  The original system was installed over 30 years ago, the tank was made of steel and was under sized for the current regulations  for a 3 bedroom […]

Ladd Hill Road Reconstruction Phases 1-2

Project Completed: Phase I: August 29, 2014    Phase II: November 1, 2016

Location: Belmont, NH
Owner: Town of Belmont
Engineer: Underwood Engineers

Reconstruction and Drainage Improvements to a main town roadway with a very steep grade (over 12%) and feeder streets.  Work included construction of new closed drainage systems along with grass, stone, and paved ditches.

The existing roadway on Ladd Hill was deteriorating and there was limited existing drainage.  The smaller side streets were in worse condition in terms of their asphalt surface.  The project […]