Project completed Spring 2006
Location: Freedom, NH
Owner: Totem Pole Park
Project Description
- Excavation for the replacement septic leach field
- Excavation for the replacement system
- Replacing the old chamber system with a new EnviroSeptic system
- Connecting the EnviroSeptic Pipes together
- Pipe Installation progressing with system sand being installed