Completed: August 2019

Location: Freedom, NH

Project Description

The project consisted of Demolition of an old camp to allow for the site work of the new home.  The site is water front property, so a perimeter drain was installed around the outside of the full foundation and then brought to day light.  We used perforated pipe in the run to daylight.  The new home was larger than the old camp so a larger septic tank needed to be installed, along with a new waterline from the well to the new foundation.