Project Completed: November 2020

Location: Moultonborough, NH
Owner: Town of Moultonborough

Project Description

The project consisted of the replacement of an existing 48″ corrugated metal pipe culvert, associated headwalls, with a 30 foot 4′ x 4′ Box Culvert Precast Structure with Precast Wing Walls. Rip-Rap apron installed at both inlet and outlet, as well as full-depth roadbed reconstruction within limits of excavation.