Towle Road & Driveway Maintenance
Project Completed: June 2021
Location: Freedom, NH
Owner: Towle Road Residence
This project consisted of reconstructing the ditch line from the driveway at 87 Cushing Corner to the location of the existing cross culvert. Replacing the existing cross culvert with a 15″ HDPE culvert 20′ long. Installation of a drop inlet on the inlet end of the culvert. Install 3/4″ gravel to the roadway and then fine grade the road.
In addition to the maintenance on Towle Road we also prepped the two […]