Project completed May, 2013

Location: Raymond, NH
Owner: Lamprey River Cooperative
Engineer: Provan & Lorber

This project required the discontinuation of 21 individual existing septic systems with individual septic tanks and a common pump station and leach field. The system utilized multiple septic tanks (some single units some double units). These tanks lead to a gravity collection line which feeds to a pump station for final treatment within a raised leaching field. The project was funded with funds from the Rural Development Loan Fund, Community Block […]