Jigger Johnson

Project Completed: October 27, 2015

Location: Jigger Johnson Campground: White Mountain Forest
Owner: United States Forest Service
Engineer: United States Forest Service
Manager: Pro Sport Inc.

Work involved replacement of an aging water system at a National Forest Campground.  The waterline stretched for nearly 6,000 feet in total and was replaced with HDPE Fusion Pipe.   The pipe run included a NHDOT road crossing of the Kangamangus Highway that required a directional drilling.  This work was the first major upgrade to the campground in many years […]

High Acres Road

Project Completed: October 22, 2015

Location: Randolph, NH
Owner: Town of Randolph

This Project involved Road Reconstruction to correct a deficient road bed.  Preexisting conditions had left the road barely passable and difficult to maintain.  Work included; replacing aging cross culverts, reshaping roadside swales, removing rocks and replacing unsuitable materials. The road surface was turned to a gravel surface in order to save costs.

This roadway had suffered from a poor subgrade with little in the way of gravel.  Rocks were protruding through the pavement […]

Econo Lodge

Project Completed: October 30, 2015

Location: West Ossipee, NH
Owner: Jamsan Hotel Management
Designer: Folsom Design Group

Installation of a replacement septic system for a failed system.  The work included removal of the failed system and replacement with a larger system for site and usage conditions.  Special care was needed for scheduling within a tight schedule based on the hotel’s needs.

The existing system had failed and was in need of replacement.  The facility has had many additions over the years which have resulted in […]

Waste Water Treatment Facility

Project Completed: September 25, 2015

Location: Sandwich, NH
Owner: Town of Sandwich
Engineer: Tighe & Bond Engineering

Replacement of settling tanks to increase volume and quality of the treatment.  The work included removal of the old tanks and replacing with two 25,000 gallon tanks to allow for more volume and settling capacity. Construction required phasing to maintain operation during construction.

The existing tanks were found to not be sufficiently settling out the solids and replacement of these tanks was needed. The existing systems and facilities were […]

Middleton Road

Project Completed: September 30 2015

Location: Wolfeboro, NH
Owner: Town of Wolfeboro
Engineer: Underwood Engineer, Inc.

This Project was a Road Reconstruction to correct drainage and a deficient road bed.  The existing roadway was a NHDOT unnumbered road which was to be turned over to the Town upon completion.  The work included enhancements and repairs to the existing drainage systems and removal of unsuitable materials.  Road work went from Route 28 (Weston’s Corner) to New Durham Town line; Approximately 1.75 miles.

As this roadway […]

Ossipee Lake Camping Area Phases 1 – 3

Project completed May, 2014

Location: Effingham, NH
Owner: Ossipee Lake Camping Area
Engineer: SFC Engineering Partnership

This project has been an ongoing project for three years where winter phasing was required to maintain access to the campground during busier months. During the course of construction the existing campground’s effluent disposal systems have been removed and replaced with DES compliant systems. The project required multiple tanks per campground area with multiple leach fields throughout the campground to handle the loading campsites can place on septic systems.

The project facility […]

Sheridan Road Reconstruction

Project completed June, 2013

Location: Moultonborough, NH
Owner: Town of Moultonborough, NH
Engineer: KV Partners

Work on this Project consisted of reconstruction of deteriorating roadway through a narrow Right-of-Way within in a neighborhood that was sensitive to disruptions and construction nuisances. The work included installation of closed drainage systems to carry water existing surface drainage systems. Also included within the project the complete box reconstruction of the supporting gravel structures of the roadway to repair existing deficiencies. Work also narrowed the existing roadway […]

Lamprey River Coop Community Septic

Project completed May, 2013

Location: Raymond, NH
Owner: Lamprey River Cooperative
Engineer: Provan & Lorber

This project required the discontinuation of 21 individual existing septic systems with individual septic tanks and a common pump station and leach field. The system utilized multiple septic tanks (some single units some double units). These tanks lead to a gravity collection line which feeds to a pump station for final treatment within a raised leaching field. The project was funded with funds from the Rural Development Loan Fund, Community Block […]

Camp Calumet Duplex Site Work and Septic

Project completed July, 2012

Location: Freedom, NH
Owner: Calumet Lutheran Ministries

The Project called for 2 foundations be dug and associated site work for 2 new camp buildings. The Project required clearing and grubbing, site grading, and other associated work to prepare the site for the new buildings which would be built separate from our contract. In addition to the buildings there was a need for a combined septic system be installed for them. While constructing the septic leach field for the 2 current […]

Freedom Public Safety Complex

Project completed May, 2012

Location: Freedom, NH
Owner: Town of Freedom, NH
Engineer: White Mountain Survey Company, Inc.
General Contractor: Desmarais & Associates, LLC.

The Project was focused on an addition to the existing Freedom Fire Station to provide new space for the Police Department and some additional space for the Fire Department. Work on this project required clearing of the wooded portions of the site, excavation for the addition, and associated site work for the drainage and other site needs. The Project required a fast time […]