Bridge Over Stony Brook Replacement

Project Completed: September 1, 2016

Location: Tamworth, NH
Owner: Town of Tamworth
Engineer: Northpoint Engineering

This Project was to replace a NHDOT Red-listed Bridge for the Town of Tamworth.  This bridge had significant scour issues under the abutments due to many factors.  To mitigate these issues a larger and better aligned with the brook channel bridge was installed.

The bridge is located on Whittier Road in Tamworth, a former NHDOT roadway.  The original bridge was installed in 1927 and was sized much smaller than current […]

Frost Brook Bridge

Project completed May, 2014

Location: Madison, NH
Owner: Town of Madison, NH
Design Build Team: G. W. Brooks and French Engineering

The Project involved the removal of a failing Red Listed bridge (in this case twin 48″ Culverts) and installation of a new precast rigid frame bridge.  As a cost savings method and in order to expedite the project it was a put out to bid as a Design-Build bridge.  This project was funded through a capital reserve plan which removed a great deal of the […]

Places Mill Road Bridge

Project completed May, 2012

Location: Alton, NH
Owner: Town of Alton, NH
Engineer: Dubois and King

The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to handle potential heavy water flows. The new bridge was designed to be capable of handling 72 ton loads and ample space for handling heavy flood flows. Throughout the project care was necessary while working next to […]

Bay Road Bridge Reconstruction

Completed October, 2010

Location: Farmington, NH
Owner: Town of Farmington, NH
Engineer: Jacobs Engineering

This project involved replacing an existing cast in place jack arch bridge with a new precast bridge. The project allowed for the closure of the road entirely during construction. During the construction large boulders (the size of cars) were discovered within the excavation for the new, larger bridge. The Project included the bridge approaches and replacement of a reinforced concrete pipe within the eastern bridge approach. In addition to the originally contracted […]

Alton Shores Culvert Replacement

Project completed November, 2009

Location: Alton, NH
Owner: Town of Alton, NH
Engineer: CMA Engineers

The Project required the replacement of an existing undersized metal culvert. The river bottom in the area of the bridge is ledge with overlying cobbles, this limited the capabilities of the cofferdam. The project involved the use of cast in place footings, cast in place stub walls, and precast open bottom box culvert. Inside of the bridge the bottom was infilled with rounded rock. The project being on a dead end […]

Replacing the Arthur White Bridge, in Lancaster NH

Arthur White Bridge, in Lancaster NH.
Project completed November 2008

Location: Lancaster, NH
Owner: Town of Lancaster, NH
Engineer: HE Bergeron Engineers

The Project involved the removal of the existing bridge and associated infrastructure. Once this was completed a Precast Ridged Frame bridge was installed. In addition to the bridge, the bridge approaches were repaired and regraded. Part of the bridge approach repair included road reconstruction and drainage. With very detailed sequencing the stream bed was restored during the installation of the bridge so as to allow […]

Burnham Road Bridge Replacement

Project completed October, 2007

Location: Freedom, NH
Owner: Town of Freedom, NH
Contracted By: Town of Freedom Highway Department

The Project involved the removal of an undersized Red Listed bridge and installation of a new precast arch span bridge. The existing bridge was only capable of handling 3 ton loads and unable to The Project entailed the installation of a Rigid Frame Bridge to replace the previous twin 6 foot culverts. In addition to new bridge installation the bridge approaches were reconstructed. The Project required the […]