Monthly Archives: June 2011

Sugar Hill Retirement Community Leach Field Replacement

Project completed June 2011

Location: Wolfeboro, NH
Owner: Sugar Hill Retirement Community
Engineer: White Mountain Survey Company, Inc.

The Project called for the replacement of 4 Effluent Disposal Areas (EDAs; leaching fields). The EDAs are designed to handle 4,975 gallons per day. The reconstruction required phasing so that only 2 fields would be offline at any one time. The project was on a fast track and because of this required construction during winter conditions which required the use of frost blankets and other unique techniques. The […]

Littleton Riverwalk Phase II

Project completed June,  2011

Location: Littleton, NH
Owner: Town of Littleton, NH
Engineer: HE Bergeron Engineers

This Project is envisioned to be a pedestrian link for all of the portions of downtown Littleton and the Ammonoosuc River Recreation area. As the second phase of the project, Phase 2 connected to where Phase 1 left off with a covered bridge. The Project was partially funded through the American Recovery and Reinvestment Act (ARRA). Being part of the ARRA this project required additional paperwork and record keeping beyond […]